| Country | Sierra Leone |
| Client | Marampa Mines (Gerald Group) |
| Power | 22 MWe |
| Fuel | LFO et HFO |
| Engines | ABC 8 x 2.7 MWe |
| Commissioning | Avril 2024 |
| Country | Sierra Leone |
| Client | Marampa Mines (Gerald Group) |
| Power | 22 MWe |
| Fuel | LFO et HFO |
| Engines | ABC 8 x 2.7 MWe |
| Commissioning | Avril 2024 |