{"id":2300,"date":"2023-08-17T16:40:11","date_gmt":"2023-08-17T14:40:11","guid":{"rendered":"https:\/\/imm.energy\/?p=2300"},"modified":"2023-08-17T16:52:10","modified_gmt":"2023-08-17T14:52:10","slug":"rehabilitation-and-extension-of-the-contador-hydroelectric-power-station","status":"publish","type":"post","link":"https:\/\/imm.energy\/en\/rehabilitation-and-extension-of-the-contador-hydroelectric-power-station\/","title":{"rendered":"Rehabilitation and extension of the Contador hydroelectric power station"},"content":{"rendered":"<p>[vc_row][vc_column]\t\n\t<!-- Section Title -->\n\t<div class=\"container-fluid no-left-padding no-right-padding single-section-hdr\">\n\t\t<!-- Container -->\n\t\t<div class=\"container\">\n\t\t\t<!-- Section Header -->\n\t\t\t<div class=\"section-header\">\n\t\t\t\t<h3><strong>Rehabilitation<\/strong> and <strong>extension<\/strong> of the Contador <strong>hydroelectric power station <\/strong><\/h3>\t\t\t<\/div><!-- Section Header \/- -->\n\t\t<\/div><!-- Container \/- -->\n\t<\/div><!-- Section Title \/- -->\n\t\n\t[vc_single_image image=&#8221;2315&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]The IMM\/HPP consortium has been entrusted by AFAP with the rehabilitation and extension of the Contador hydropower plant in the Democratic Republic of S\u00e3o Tom\u00e9 and Pr\u00edncipe.<\/p>\n<p>IMM is delighted to be part of this fantastic mission to build a 3.9 MW hydroelectric power station comprising two Pelton turbines manufactured by HPP.<\/p>\n<p>The complete EPC mission includes, among other things, the turbines, electromechanical auxiliaries, electrical substation, telecommunications and scada.<\/p>\n<p>IMM is proud to contribute to the supply of renewable energy on the island.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_single_image image=&#8221;2315&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]The IMM\/HPP consortium has been entrusted by AFAP with the rehabilitation and extension of the Contador hydropower plant in the Democratic Republic of S\u00e3o Tom\u00e9 and Pr\u00edncipe. IMM is delighted to be part of this fantastic mission to build a 3.9 MW hydroelectric power station comprising two Pelton turbines manufactured by HPP. [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":2474,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[16],"tags":[],"_links":{"self":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/2300"}],"collection":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/comments?post=2300"}],"version-history":[{"count":31,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/2300\/revisions"}],"predecessor-version":[{"id":2376,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/2300\/revisions\/2376"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media\/2474"}],"wp:attachment":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media?parent=2300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/categories?post=2300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/tags?post=2300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}