{"id":1659,"date":"2014-04-14T22:28:48","date_gmt":"2014-04-14T20:28:48","guid":{"rendered":"https:\/\/imm.energy\/site\/?p=1659"},"modified":"2019-06-12T22:31:37","modified_gmt":"2019-06-12T20:31:37","slug":"imm-wins-the-contract-to-modernise-the-balingue-power-plant-in-mali","status":"publish","type":"post","link":"https:\/\/imm.energy\/en\/imm-wins-the-contract-to-modernise-the-balingue-power-plant-in-mali\/","title":{"rendered":"IMM wins the contract to modernise the Balingu\u00e9 power plant in Mali."},"content":{"rendered":"<p>[vc_row][vc_column]\t\n\t<!-- Section Title -->\n\t<div class=\"container-fluid no-left-padding no-right-padding single-section-hdr\">\n\t\t<!-- Container -->\n\t\t<div class=\"container\">\n\t\t\t<!-- Section Header -->\n\t\t\t<div class=\"section-header\">\n\t\t\t\t<h3>IMM wins the contract to <strong>modernisation <\/strong> the <strong>Balingu\u00e9 <\/strong>power station in<strong> Mali <\/strong>.<\/h3><p>This 22 April 2014, Energie Du Mali (EDM), the public electricity producer of the Republic of Mali, officially entrusted IMM with the conversion to heavy fuel oil and the renovation of the instrumentation &amp; control of the Balingu\u00e9 power station, located in the city of Bamako.<\/p>\n\t\t\t<\/div><!-- Section Header \/- -->\n\t\t<\/div><!-- Container \/- -->\n\t<\/div><!-- Section Title \/- -->\n\t\n\t[vc_single_image image=&#8221;1662&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]This conversion will enable EDM to significantly reduce the fuel costs associated with the production of this plant.<\/p>\n<p>For an amount of more than six million euros, this operation aims at the modernization of this 22MW power plant, originally installed by IMM. This will be done on a particularly short 9-months schedule.<\/p>\n<p>This realization takes place in the context of a long and fruitful cooperation of more than twenty years between Energy of Mali and IMM.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_single_image image=&#8221;1662&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]This conversion will enable EDM to significantly reduce the fuel costs associated with the production of this plant. For an amount of more than six million euros, this operation aims at the modernization of this 22MW power plant, originally installed by IMM. This will be done on a particularly short 9-months schedule. [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":1662,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[44],"tags":[],"_links":{"self":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/1659"}],"collection":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/comments?post=1659"}],"version-history":[{"count":0,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/1659\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media\/1662"}],"wp:attachment":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media?parent=1659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/categories?post=1659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/tags?post=1659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}