{"id":1594,"date":"2018-11-15T17:32:18","date_gmt":"2018-11-15T16:32:18","guid":{"rendered":"https:\/\/imm.energy\/site\/uncategorized\/start-of-production-of-the-tadjourah-djibouti-power-plant\/"},"modified":"2019-06-12T09:35:20","modified_gmt":"2019-06-12T07:35:20","slug":"start-of-production-of-the-tadjourah-djibouti-power-plant","status":"publish","type":"post","link":"https:\/\/imm.energy\/en\/start-of-production-of-the-tadjourah-djibouti-power-plant\/","title":{"rendered":"First energy generation for the new Tadjourah power station (Djibouti)"},"content":{"rendered":"<p>[vc_row][vc_column]\t\n\t<!-- Section Title -->\n\t<div class=\"container-fluid no-left-padding no-right-padding single-section-hdr\">\n\t\t<!-- Container -->\n\t\t<div class=\"container\">\n\t\t\t<!-- Section Header -->\n\t\t\t<div class=\"section-header\">\n\t\t\t\t<h3>First energy generation for the new <strong> Tadjourah (Djibouti) power plant<\/strong><\/h3>\t\t\t<\/div><!-- Section Header \/- -->\n\t\t<\/div><!-- Container \/- -->\n\t<\/div><!-- Section Title \/- -->\n\t\n\t[vc_single_image image=&#8221;758&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]This Friday, all of the Tadjourah power plant has been, for the first time, connected to the network and has made its first power production.<\/p>\n<p>This event is the result of the rehabilitation and extension project of the Tadjourah plant which was entrusted to IMM by Electricit\u00e9 de Djibouti.<\/p>\n<p>This additionnal production capacity will sustain the development of the Republic of Djibouti&#8217;s cities and harbours.<\/p>\n<p>Once again, IMM is proud to underline the seamless and efficient cooperation with the whole team of Electricit\u00e9 de Djibouti, an historical trusted customer.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_single_image image=&#8221;758&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_column_text]This Friday, all of the Tadjourah power plant has been, for the first time, connected to the network and has made its first power production. This event is the result of the rehabilitation and extension project of the Tadjourah plant which was entrusted to IMM by Electricit\u00e9 de Djibouti. This additionnal production [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":758,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[44],"tags":[],"_links":{"self":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/1594"}],"collection":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/comments?post=1594"}],"version-history":[{"count":0,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/posts\/1594\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media\/758"}],"wp:attachment":[{"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/media?parent=1594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/categories?post=1594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imm.energy\/en\/wp-json\/wp\/v2\/tags?post=1594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}